It's taken us a while, but we are finished with phase 2 and almost done with phase 3 of our bedroom remodel. For phase 2, electrical work, Wes was the mastermind behind all of that. It took him a few weeks, but he had some crazy stuff to work with and figure out, including hidden junction boxes in the wall, climbing in the boiling hot attic more then 20 times, feeding a chord from the attic to the basement, and the worst, dealing with the previous owners "electrical skills" when they remodeled the first time. I am so proud of him for figuring everything out on his own. He is so smart, and I love him. Here's a picture of some of the electrical stuff that Wes put in.
Our goal is to have the sheetrock done by the end of the weekend so we can hire a mudder to come in and mud for us. We decided that after our horrific job mudding in the kitchen that we should just hire that part out so that it looks nice. I think that will save our marriage. ;)
Stay tuned for more phases to come.